This 2018 book, based on four years of DORA research, is the first assignment for an FDE on site: measure the customer's delivery capability first, then propose solutions.

封面: Accelerate: The Science of Lean Software and DevOps: Building and Scaling High Performing Technology Organizations

Accelerate: The Science of Lean Software and DevOps: Building and Scaling High Performing Technology Organizations · Nicole Forsgren ·

Cover image: Open Library

Key Takeaways

  • *Accelerate* (IT Revolution, March 27, 2018) was written based on four years of research, with data drawn from the State of DevOps reports.
  • The four metrics are: deployment frequency, lead time from commit to production, the percentage of deployments causing failures, and time to restore service.
  • DORA now groups the metrics into throughput and instability, and has added the deployment rework rate, bringing the total to five.

Many customer meetings get stuck on the same complaint: "Our team deploys too slowly." Slow compared to whom? By how much? No one in the room can produce numbers. What *Accelerate* teaches is turning that complaint into four numbers that anyone can verify.

The book's authors are Nicole Forsgren, Jez Humble, and Gene Kim. The subtitle promises a scientific approach to Lean and DevOps, helping organizations build and scale high-performing technology teams. IT Revolution published the book on March 27, 2018, and it won the Shingo Publication Award.

For a Forward Deployed Engineer (FDE), the value of this book lies not in how long ago it was published, but in the capability it builds: measuring an organization's software delivery capability before making any recommendations. Once on site at a customer, the first question is always: where is their team right now?

What data is this book built on?

According to IT Revolution, the book is the result of four years of research, with data collected for the State of DevOps reports. The publisher promises readers will learn how to measure team performance and which capabilities to invest in.

Behind these numbers is DORA (DevOps Research and Assessment), a multi-year research program run to academic standards. As early as its 2015 report, DORA found that high-performing IT organizations far outpaced their competitors on four key software delivery metrics. *Accelerate* turned these findings into a book.

Four numbers—try them on a real customer

Google Cloud, in introducing DORA's "Four Keys," defines these metrics as follows. Deployment Frequency is how often an organization successfully releases to production. Lead Time for Changes is how long it takes a commit to reach production.

Change Failure Rate is the percentage of deployments that cause failures in production. Time to Restore Service, also known as Mean Time to Recovery (MTTR), is how long it takes an organization to recover from a production failure.

Suppose you've just joined a logistics company. Over 30 days, their team completed 20 successful production deployments. Deployment frequency is 20 per 30 days, or one release every day and a half on average.

Of those 20 deployments, 3 caused incidents, so the change failure rate is 3/20, or 15%. For lead time, don't look at just one commit—calculate it for each change, then take the median. Suppose the median is about four days, meaning a typical commit written on Monday morning doesn't reach the customer until Friday afternoon.

Recovery time works the same way. The three incidents took 30 minutes, 1 hour, and 6 hours respectively. The median is 1 hour, the average is 2.5 hours; if you report the 6-hour incident alone as "recovery time," the customer's team looks worse than it really is. The worst case deserves to be told as a story of its own, not reported as a metric.

With these four numbers, the nature of the meeting changes. You no longer say "deployments are slow"; you say "a typical commit takes four days to reach the customer, and 3 out of every 20 deployments cause an incident." That's a problem you can scope, not a feeling.

Three points to bring to the customer site

The first is simple: measure first, then advise. The book promises to help you decide which capabilities to invest in, but only if you have baseline data in hand. On site, the first thing to do is get the deployment logs and incident history, not start arguing about which tools to use.

The second point comes from how DORA now organizes its metrics: one group reflects the throughput of software changes, the other reflects instability. Only by looking at both together can you avoid a common trap: declaring victory because deployment counts went up, while the incident rate rises along with them.

The last point is a shared language with management. IT Revolution explicitly states that this book is highly suitable for managers at all levels. FDEs often need to persuade both the CTO and the head of operations at the same time, and these four metrics are understandable to both sides without a prior architecture walkthrough.

Why open dora.dev before opening the book?

"The four metrics" was the 2018 framing. Since then, DORA has expanded to five metrics, adding the deployment rework rate. If you cite this book in a customer meeting without knowing that, an attentive listener will spot the error immediately.

So the sensible order is: first read the "DORA metrics: the four keys" page on dora.dev to grasp the current definitions; then read *Accelerate* to understand why these numbers are trustworthy; finally read Google Cloud's article "Using the Four Keys to measure your DevOps performance" to see how they're measured in practice.

This book suits developers with two to eight years of experience who are familiar with CI/CD but have never had to explain to non-technical people why the pipeline matters. If your goal is an FDE role, this is exactly the step from "knowing how to deploy" to "being able to measure an entire organization's deployment capability."

Real logs are never clean: an exercise

Deployment logs at a customer site rarely look as tidy as the example above. Below is a hypothetical week of logs, deliberately made messy. Work out all four metrics yourself first, then check the answers that follow.

Deployment timeEnvironmentResultEarliest commitNotes
Monday 09:10productionSuccessSunday 22:00—
Monday 09:12productionSuccessSunday 22:00Job rerun, duplicate build
Tuesday 14:00stagingSuccessTuesday 10:00—
Wednesday 16:30productionFailed in pipelineWednesday 11:00Never reached production
Wednesday 17:45productionSuccessWednesday 11:00Caused an incident, recovered at 18:30
Friday 10:00productionSuccessThursday 15:00—

Answers: clean the data first, then calculate

The cleaning step determines everything. Remove the duplicate reruns, remove staging, and remove that failed pipeline run, since it never reached production. What remains is 3 successful releases, so the deployment frequency is 3 per week.

One of the three caused an incident, so the change failure rate is 1/3, about 33%. The lead times for the three were 11 hours 10 minutes, 6 hours 45 minutes, and 19 hours, with a median of 11 hours 10 minutes.

The time to restore is 45 minutes. If you miscount and treat it as 6 deployments, the frequency doubles, the failure rate drops to about 17%, and the client's team looks twice as stable as it really is.

Turning this into a job-hunting advantage

When reading job descriptions for FDE or Solutions Engineer roles, watch for phrases like "deployment", "time to production", or "measuring delivery performance". They signal that the employer wants someone who can speak with numbers.

On a resume, a line like "reduced the median lead time from commit to production from four days to under one day" carries far more weight than "experienced with DevOps". The numbers must be ones you measured yourself on a real project, and when asked, you should be able to explain clearly how you cleaned the logs.

Accelerate won't teach you how to write any specific pipeline. It teaches you to walk into an unfamiliar organization and figure out where it stands within the first week, which is exactly what clients pay a Forward Deployed Engineer to deliver.

Was this article helpful?

Thanks for your feedback!

4 sources

Next on the roadmap · Phase 6: Measuring Value Maven's highest-grossing AI evals course starts with reading model outputs. The two instructors believe that eval criteria only emerge after humans score the outputs, and FDEs have to find them on their own; the course costs $4,200.