Campaign settings checked by hand across ad platforms
Trader hours on setup, and errors that slip through
What FDE deliversA tool that checks settings against your rules and stages the changes for a trader
Forward Deployed Engineering
PMG’s forward deployed engineers work inside your teams to find the problems worth solving first, then design and ship solutions that work with your data and your approval rules. Most engagements reach production in four to eight weeks, and your people decide how the system works.
- Available to PMG clients
- SOC 2 Type II
- Built by PMG
Last updated
The challenge
Why do custom solutions stall before they ship?
Few marketing teams have tools built around how the work happens, where a trader sets up a campaign or a brand lead signs off on a version for a new market. What’s missing is usually small and specific: an approval rule, a product taxonomy, or an attribution method that no packaged tool supports.
Until now, teams have had two options. A consultancy writes a roadmap and leaves the build to your team, or the request joins an internal engineering backlog that can take months to reach it.
Weeks of production for each launch
What FDE deliversA pipeline that generates, resizes, checks, and tags versions for brand and legal review
Work happens in spreadsheets beside the tool
What FDE deliversAn app built around your team’s approvals and decisions, in Alli Apps
Bidding works from incomplete data
What FDE deliversFirst-party signal pipelines that send conversions back to the ad platforms
The system
What does a forward deployed engineer do at PMG?
A forward deployed engineer (FDE) is a software engineer who works inside a client’s business, alongside the people who run it, to find the problems that cost the most and solve them in production, with AI where it helps. At PMG, they map how decisions get made, then design and ship the systems behind them, and they stay until the team runs the system as part of its normal work. What they learn feeds back into Alli’s products, so later clients get those improvements as well.
The work ships in one of three places: inside Alli as an app in Alli Apps or an automation in Generative Workflows, as agent skills in Alli4u, or as an integration with the client’s own systems through their APIs. Each build has a named team that owns it and uses it.
FDE is separate from PMG’s other teams, so each request reaches the right people:
| Team | What it delivers | What it doesn’t do |
|---|---|---|
| Forward Deployed Engineering | Solutions in production: custom apps, API automations, agent skills, and integrations | Build dashboards or run routine data pulls |
| Advanced Analytics | Dashboards, KPI reports, attribution models, and incrementality studies | Build custom apps or automate platform actions |
| Alli product engineering | Features every Alli client gets | Build one-off tools for a single client |
| Account and strategy teams | Account plans, media plans, and budget recommendations | Write code or configure API integrations |
In action
What problems does FDE solve?
These four examples show the kinds of engagement FDE takes on. They’re illustrations, so no client results are named.
Example scenario
Campaign and media operations
The situation
Traders set budgets, flight dates, and targeting across several ad platforms, then check each setting by hand. Pacing problems surface after the money is spent.
What FDE delivers
A tool that checks campaign settings against the client’s business rules, stages bulk changes through the platform APIs, and watches budget pacing. When delivery drifts, it posts a summary in Slack with the change it suggests.
What you decide
The rules each campaign is checked against, and each change before it goes live, with a trader signing off on it.
Example scenario
Creative and content production
The situation
A launch needs versions for each market, language, and ad format. Each one is made, resized, and checked by hand, and production takes weeks.
What FDE delivers
A creative automation pipeline that connects product data and the promotion calendar to image and language models. It generates versions, resizes them for each placement, checks them against brand rules, and tags them for reporting.
What you decide
The brand rules and the legal checks. Regional leads review each version before it goes to the ad platforms. The pipeline works alongside Alli Creative Studio, which handles template-based production.
Example scenario
A custom app for one team’s decisions
The situation
Some decisions, such as setting a promotion’s discount or localizing ads for franchise locations, depend on rules no packaged tool knows, so the team makes them in a spreadsheet.
What FDE delivers
A single-purpose app in Alli Apps, built around that decision: a promotion margin calculator, a store performance view, or a franchise ad manager. It has role-based access and logs each change.
What you decide
Who can use the app, what each role can change, and when a new version ships after its review.
Example scenario
Measurement and signal engineering
The situation
Privacy changes and disconnected point-of-sale data cause signal loss. They leave holes in conversion tracking, so ad platforms optimize against incomplete signal.
What FDE delivers
Conversions API pipelines, automated clean-room queries, and identity matching that send first-party conversions back to the ad platforms. Where Alli Audience Gateway covers the need with managed server-side tracking, FDE handles what sits around it.
What you decide
Which data is shared, with which platforms, under your privacy and consent rules. Reporting on the results stays with Advanced Analytics.
People in charge
Where do your people stay in charge?
Built to scale your team’s judgment, not replace it.
FDE designs the system and writes the code. Your team sets the rules it follows and signs off on the decisions that matter. Each engagement starts with a named owner who will use the system day to day.
What FDE and Alli doMap the workflow and size the manual effort
What your people doPick the problem worth solving, and name the owner
What FDE and Alli doTurn the team’s criteria into checks the system runs
What your people doDefine the rules, and approve changes to them
What FDE and Alli doStage changes, flag problems, and draft the next step
What your people doApprove each change before it goes live
What FDE and Alli doTest each version with the people who use it
What your people doReview each deploy, and decide when it ships
What FDE and Alli doRecord what the system did and when
What your people doJudge whether it met the goal set at the start
FDE builds on Alli, so each system starts from data and security that are already in place. Alli Data and the Semantic Layer give each system the same definitions and numbers. Alli4u is where engineers develop and test agent skills and automations. Alli Apps turns them into apps a team uses in its daily work, with role-based access, a review on every deploy, and an audit trail on every run.
For AI across the whole company, see Alli for Enterprise AI. For recurring jobs your own team sets up, see Alli for Workflow Automation.
Your options
How is FDE different from consultants or in-house engineering?
| Off-the-shelf software | Consulting firm | Internal engineering | Forward Deployed Engineering | |
|---|---|---|---|---|
| What you get | Standard features built for all customers | A roadmap and recommendations | Custom code, when the request reaches the top of the backlog | A working system in production, built around your business |
| Who builds it | The vendor, for its whole market | Your team, after the engagement | Your engineers | PMG engineers, with your team |
| Time to production | Immediate, if the features fit | After the roadmap, on your own timeline | Often months | Typically four to eight weeks |
| Fit with your rules | You adapt to the tool | Depends on your build | High | Built around your approvals and data |
Getting started
How does an FDE engagement work?
Most engagements run four to eight weeks from kickoff to production, in three phases. Each one is tied to a business goal agreed at the start.
| Phase | What happens | What you have at the end |
|---|---|---|
| Discovery and scope | FDE maps the workflow with the people who do it, and agrees the goal and the first version | A scoped first version and the measure of success |
| Build with your team | FDE writes the first version and tests it with the people who’ll use it, week by week | A working version that your team has used and shaped |
| Harden and roll out | Security review, production setup, and rollout to the whole team | The system in daily use, with an owner and a support plan |
FDE takes on work that meets three conditions. The problem has a clear business stake, such as margin, retention, or a large amount of manual work. A named person or team will use the system and own its rules. And the goal can be met in one bounded engagement.
What PMG’s Forward Deployed Engineering team does, and how an engagement works.
What does FDE stand for?
FDE stands for forward deployed engineer: a software engineer who works inside a client’s business, close to where the work happens, to solve its costliest problems in production. At PMG, Forward Deployed Engineering is also the name of the team those engineers belong to, so “FDE” can refer to either.What is Forward Deployed Engineering at PMG?
It’s a PMG team of software engineers who work with a client’s business teams to build solutions on Alli and put them into production. They pick the problems with the biggest business stake and stay until the team runs the app, automation, or integration as part of its normal work. Your people set the rules and sign off on what the system does.How long does an FDE engagement take?
Most engagements run four to eight weeks from kickoff to production. The first phase maps the workflow and scopes the first version. In the second, FDE delivers it and tests it with the people who’ll use it. The third covers the security review and rollout. Each engagement is tied to a goal agreed at the start.Does FDE build dashboards and reports?
No. Dashboards, KPI reports, attribution models, and incrementality studies come from PMG’s Advanced Analytics team. FDE’s systems act: apps, automations, agent skills, and integrations that stage changes for people to confirm. When a project needs both, the two teams work on it together.Who owns the work when the engagement ends?
Your organization owns the code. Each system has a named owner on your team from the first week. After rollout, FDE can keep supporting it, or your own engineers can take it over. Systems built in Alli Apps keep their role-based access, reviews, and audit trail either way.Is it secure to build on Alli?
Yes. The Alli platform holds a current SOC 2 Type II report from an independent auditor. Apps built in Alli Apps use role-based access, deploy reviews, and audit trails. Agents act within each user’s existing permissions, and your security team checks the system before rollout.Does FDE work on AI search visibility?
Yes. PMG’s teams, including Forward Deployed Engineering, do the AEO and GEO work for clients: readable pages, crawler access, structured data, and product feeds. Alli Brand Equity then measures how often AI answers name and cite the brand, next to the brand’s other signals.Who can work with Forward Deployed Engineering?
FDE works with PMG clients on problems with a clear business stake and a named team that will rely on the system. Book an intro with your PMG team to talk through the workflow you want to change.
Book an intro and walk us through the problem. We’ll tell you whether it fits an FDE engagement, and what the first version would do. Forward Deployed Engineering is available to PMG clients.