When you try to outsource AI development to an external company, the first meeting is all about "starting with an assessment" and "let's include a PoC." You hear the names of the phases, but before commissioning the work, it's hard to see how many phases there are in total, what gets decided at each point, and what the client side is expected to do.
Below, I break down the AI development process into six phases, from preparing the request to operation. The phase divisions are based on the approach in METI's contract guidelines, and for each phase I've tabulated what the client side should do and how to decide whether to move on to the next phase. The details of PoCs are covered in What Is an AI PoC?, and the items to decide before a PoC in How to Define AI Requirements.
Think of the AI development process in stages
In ordinary system development, the flow is usually to first nail down what to build and then build it exactly as specified. If you follow this flow in AI development, you're likely to stumble.
In June 2018, METI published the "Contract Guidelines on AI and Data Utilization." According to the guidelines' commentary, AI technology has the characteristics that the content and performance of a trained model often cannot be specified at the time of contracting, and that its content and performance often depend on the training data. The guidelines therefore proposed an "exploratory, phased" approach, which allows iterative, trial-and-error development, unlike the waterfall model that fixes requirements up front.
In the exploratory phased approach, development is divided into four stages: the assessment stage, the PoC stage, the development stage, and the additional training stage. At each stage, you verify whether the goal can be achieved with AI and whether to proceed to the next stage, and both the client and the developer confirm this before moving on. The commentary states that this approach can limit troubles arising from differing understandings of deliverables and the risks of development failure.
These guidelines were written with machine learning in mind. Today's generative AI often works by calling pre-trained models provided by vendors via APIs, so there are few situations where you build your own model. Even so, in my view, the framework of dividing work into stages and deciding at the end of each stage whether to proceed applies directly to generative AI development as well. With generative AI, instead of building a model, you iteratively test and refine the prompts, the internal documents to reference, and how to connect with other systems, stage by stage.
Six phases from request to operation
I added preparation before the request and deployment to production to the guidelines' four stages, dividing the process into six phases. The following table is my own organization of this.
| Phase | What is done | What the client does | Decision to proceed |
|---|---|---|---|
| 1. Consultation preparation | Decide what to improve and find whom to ask | Pick one target business process and count the current volume and time | Is there a goal written in business numbers? |
| 2. Assessment | Quickly see, with a small sample, whether AI can achieve it | Provide sample data. Sign an NDA | Is it worth trying? |
| 3. PoC | Try it with real business data and confirm it meets a usable standard | Set the pass criteria. Judge whether results are correct | Did it meet the criteria set beforehand? |
| 4. Development | Build it into a form usable in the business and connect it to other systems | Decide permissions and data handling. Run acceptance tests | Did it meet the acceptance criteria? |
| 5. Deployment to production | Start with a few departments and teach people how to use it | Decide who uses it. Set a contact point for when mistakes happen | Is it actually being used in the field? |
| 6. Operation | Monitor behavior and keep refining prompts, referenced documents, and the model | Decide who maintains it and the budget. Review results regularly | Continue, expand, or stop? |
Phases 2 through 4 match the guidelines' stages. Phase 6 corresponds to the guidelines' additional training stage, but with generative AI the focus is less on retraining and more on updating prompts and referenced documents and swapping models, so I call it operation.
I believe the right-hand column of the table is the most important part of this process. It's fine to reduce or increase the number of phases. However, before starting, write down who will decide "whether to proceed" at the end of each phase, and by what criteria. If you don't, every phase stretches out little by little and never ends.
What the client does in each phase
Even when you outsource AI development, there remains work that only the client side can do. I'll go through it phase by phase.
In phase 1, consultation preparation, narrow the target down to a single business process. With a vague request like "could AI do something for us?", the vendor has no choice but to propose broadly. If you pick one process and count how many cases it handles per month and how many minutes each takes, the first meeting becomes concrete. How to choose a vendor is covered in Build AI In-House or Outsource It?.
Phase 2, the assessment, is short. The guidelines' commentary envisions a format where the vendor receives limited sample data, verifies in a short period whether AI technology can be introduced, and delivers a simple report of the results. The client should provide even a small amount of data close to production. If you look only at neatly prepared data, results will change when you switch to real data in the PoC.
In phase 3, the PoC, set the pass criteria before starting. If you think up criteria after seeing the results, any outcome tends to become "it seems usable if we try a bit more." Judging whether results are correct is also something only employees who know the business can do.
In phase 4, development, decide permissions and data handling. When AI references internal documents, who may view which documents is determined by the client's internal rules. The client also prepares the question-and-answer pairs used for acceptance testing.
In phase 5, deployment to production, don't roll out to the whole company at once; start with a few departments. The "Guidelines for Secure AI System Development," created by the UK's NCSC together with the US's CISA and others, lists, for the deployment stage, establishing incident management procedures in advance, releasing after appropriate testing, and showing users proper usage. Decide where in the field people should contact when the AI makes a mistake before they start using it.
Phase 6, operation, is a phase with no end. Decide who will maintain it and the budget for that before the development contract.
Sign contracts separately for each phase
The guidelines' model contracts are structured so that a separate contract is signed for each stage.
| Phase | Model contract | Nature of contract | Deliverable |
|---|---|---|---|
| Assessment | Non-disclosure agreement | Confidentiality | Simple report of verification results |
| PoC | Implementation verification contract | Quasi-delegated (junrei) type | Report summarizing verification results |
| Development | Software development contract | Quasi-delegated (junrei) type | Trained model |
Both PoC and development are quasi-delegated (jun-i nin) contracts. Under a quasi-delegated contract, payment is made for the work itself rather than for completion of the job. The model contract also includes a clause stating that the developing party bears no obligation to complete deliverables or guarantee performance. Since AI performance is unknown until you build it, using a fixed-price (ukeoi) contract that promises completion and performance would force one side or the other into an unreasonable position.
No model contract has been created for the additional development stage, because its forms vary widely. For the operation stage, the ordering party and the developing party decide everything from scratch. In my view, the three things to settle in the operation contract are: who monitors the system's behavior, who to notify when something happens, and who verifies things when prompts or models are changed.
On February 18, 2025, METI also published the "Contract Checklist for AI Use and Development." This is a document to help users of AI services verify things such as the scope of use of the data they provide when signing contracts. Before concluding contracts for each phase, it is a good idea to at least check the items concerning data handling.
How to estimate costs for each phase is summarized in Breakdown of AI Implementation Costs.
The operation phase becomes longer with generative AI
In development using generative AI, the phase after going into production is longer than with ordinary systems. There are two reasons.
The first is that the model in use may change at the provider's discretion. Anthropic states that it will notify customers using a published model at least 60 days before ending its provision. For example, Claude Sonnet 4.5 is scheduled to be notified to users on September 30, 2026, and its provision will end on November 30, 2026. When you switch models, even the same prompt may produce different answers. Before switching, you need to have the new model solve the questions used in acceptance testing and compare the results.
The second is that the internal documents and business processes the AI references will change. When regulations are revised or products are added, the documents the AI references must also be replaced. Someone needs to verify whether the replacement has changed the answers.
The aforementioned NCSC guidelines also mention, for the operation and maintenance phase, monitoring the system's behavior and supporting users so they can evaluate changes in behavior caused by changes to models and the like. How to build an operation framework is described in What Is LLMOps.
In my view, of all the phases in AI development, this sixth phase is the one ordering parties most easily overlook. When comparing development estimates, alongside the cost of building, check who will do what during the operation phase. The reasons PoCs stall without leading to production and how to break out of that are summarized in Getting Past AI PoC Stalls.
The same people span multiple phases
When phases are divided, the people or companies in charge may change from phase to phase: assessment by a consulting firm, PoC by a different development company, and operation by the in-house IT department, for example.
With this division, what was learned in an earlier phase is hard to pass on to the next. The insight learned in the PoC that "AI tends to get this type of inquiry wrong" may be written in a report, but it won't reach the development team in fine detail. In my view, at least from the PoC through the introduction into production, having the same person handle it throughout reduces stumbling blocks.
An FDE (Forward Deployed Engineer) is a role where the same person works on-site at the ordering party's location, handling everything from the PoC to production operation. What the job involves is described in What Is an FDE. The details and fees of our support are summarized on our Services page.