[2026 Edition] Can Full-Stack Engineers Earn Over ¥10 Million a Year? The Realities of Skills, Projects, and Rates for Moving Beyond Being a Jack of All Trades
Building solutions, not just products, and turning them into business results
Seven reasons why people seeking high-rate projects choose us
- Payout rate is nearly 80% or higher All details are disclosed during the meeting; we hide nothing
- Around 80% of our projects are direct contracts with end clients
- Payment terms as short as 35 days
- One in five applicants can proceed to a meeting
- Project managers and experienced engineers support you in winning high-rate projects
- You can start as soon as 4 business days after the meeting
- 90% of projects offer remote work environments
Behind engineers who tried side work but felt they "couldn't earn as much as expected" or "couldn't keep it up" lies not a lack of skill, but structural problems: mistakes in project selection and deep transaction layers.
In this article, we will organize what salaried engineers need to know to aim for ¥300,000 per month, from the realities of the side-work market to how to identify projects that won't fail, and tax and labor matters to watch out for.
About the author Shohei Tokumitsu
Representative Director of DeFactory. Based on experience leading multiple 0-to-1 new business developments in software development, both in-house and at other companies, and driving business growth, he currently works as an FDE consultant/delivery lead and Product Manager (PdM), as well as handling recruitment (FDE, senior SE, PM, PMO, CPO, CTO, consultants).
https://www.linkedin.com/in/shohei-tokumitsu/The side-work market is expanding both institutionally and in practice. However, "projects exist" and "good-condition projects are easy to land" are different matters. Let's start by accurately understanding the current state of the market.
For engineers with 5+ years of practical experience
High-rate, direct-contract project information
According to PERSOL Research's "Fourth Quantitative Survey on the Actual State and Awareness of Side Jobs" (published October 2025), the rate of companies accepting side jobs has grown to 64.3%, and the rate of full-time employees doing side work reached 11.0%, the highest since the survey began. On the institutional side, the Ministry of Health, Labour and Welfare revised its "Guidelines on Promoting Side Jobs and Concurrent Employment" (March 31, 2025 edition), clarifying that companies should not restrict side jobs more than necessary.
Source: PERSOL Research "Fourth Quantitative Survey on the Actual State and Awareness of Side Jobs" (2025)
Looking at the actual project market, low-workload projects for engineers do exist. IT Pro Partners advertises "2-3 days per week, direct with end clients, 8,000+ projects," while Shuumatsu Worker offers projects under conditions like "10+ hours per week, fully remote, generally no specified hours." Projects that salaried employees can work on alongside their main job do exist in the market at a certain scale.
Projects combining low workload, full remote, and high rates naturally attract a flood of applicants. Even if a listing says "2 days a week OK," what's being evaluated remains the same: whether you can deliver results within limited time.
What companies seek in side-work talent is not someone waiting for instructions, but "the ability to work independently even in short bursts." Engineers who can clarify somewhat ambiguous requirements themselves and make progress even with just a few hours a week are the ones chosen. In other words, the better the conditions of a side project, the higher the selection bar.
[Our Own Data] Of the published projects on BizDev Tech, which we operate (183 projects total, both open and closed, created between September 2024 and June 2026), only 4 projects (2.2%) had a minimum workload of 80 hours or less per month (equivalent to 2 days a week), and only 2 had a maximum workload also capped at 80 hours or less per month. The remaining 179 assume a workload of 120+ hours per month. The feeling that "there are few side-work-friendly projects" is confirmed by data even in our own listings (not figures for the overall market including other companies). The few low-workload projects tend to attract concentrated applications, and the selection bar is likely to rise accordingly.
It is true that side work is no longer a special way of working. There are cases of active engineers who took stock of their skills and reached the ¥300,000-per-month level working 1-2 days a week. As a rough guide, the average listed rate of our published projects is ¥798,000 per month; by simple calculation proportional to working hours, ¥300,000 per month is reachable with around 60 hours per month (just under 2 days a week) of work (actual compensation varies depending on settlement terms and per-project rates).
However, "being able to do side work" and "anyone earning the same way" are different matters. Most people who failed to earn as much as expected from side work didn't miscalculate their registered services or working hours; rather, they often misjudged the quality of the projects they joined. This perspective of "project quality" will be the theme of the following chapters.
If you discuss the value of side work only in terms of "increased income," you miss the essential point. For engineers, side work is also a place to test how marketable they are outside their company.
Salaried engineers usually operate within internal evaluations and role divisions. How their skills are priced in the external market, how to present themselves to be valued, and what generates compensation are hard to see from inside the company alone.
When you attend a side-work meeting, you face these questions for the first time. "What architecture design experience do you have?" "How many hours a week can you work, and in what form?" "What track record do you have on similar projects?" Whether you can answer these in your own words is the first indicator of your marketability in the side-work market.
Even engineers whose main job is maintenance-focused or starts from detailed design onward may be able to touch different phases through side work: clarifying a client's vague requirements, estimating, and deciding what to build first. This has far more concrete value than the abstract claim that "your technical range widens."
What DeFactory values as "business-oriented engineering" is exactly this perspective. Engineers who can make technical decisions about business challenges, not just implement given instructions, are valued at higher rates both in the side-work market and after going independent.
[Related article] Everything Freelance Engineers Should Know About Winning Projects | Strategies and Tips for Success
Quitting your job suddenly to go freelance carries significant risk. With side work, you can keep your main income while testing on a small scale: "Can I land projects?" "What will I be asked in meetings?" "Can I handle contracts, invoicing, and taxes?"
In fact, many engineers use side-project experience as a springboard to try going freelance. Side work works well as a way to test whether your skills can win work from the market before quitting your main job.
The strategic use of side work is that while earning income from it, you can simultaneously explore directions that will raise your future rates. Areas such as AI, data platforms, LLM utilization, business process automation, and machine learning are handled extensively in BizDev Tech as high-value-added projects.
"Which technologies and roles should I focus on to increase my compensation?" — the answer to this question often only becomes clear once you gain exposure to external projects through side work. Rather than treating side work as merely extra income, using it as a place to explore your next market value is what pays off for your mid- to long-term career.
There are broadly four routes for finding side work projects. None of them is the definitive "right" answer; what matters is choosing the one that fits your current phase and goals.
The characteristics of each route are summarized in the table below.
| How to Find Projects | Advantages | Disadvantages and Cautions | Suitable Phase |
|---|---|---|---|
| Crowdsourcing | Many projects available and easy to start | Extremely low rates and prone to price competition | Beginners building a track record (temporary) |
| Side work matching services | Many flexible projects, such as 10 hours per week | Risk of unclear supply chains or discrepancies with actual workload | Mid-level engineers starting side work |
| Highly transparent agents | Shallow supply chains (direct to end clients), making it easy to verify conditions and actual circumstances (though low-workload projects themselves are rare) | High skill levels required | Those preparing for independence and high-class professionals |
| Social media and personal referrals | Low sales costs and projects tend to be ongoing | Low repeatability and difficult for beginners | Mid-level and above with a certain track record and network |
The advantage of using an agent is that project introductions, rate negotiations, and contract support can all be handled together. For side work beginners, it also helps them objectively understand which projects their skills are suited for.
However, not all agents are the same. For side work, what is particularly important is a shallow supply chain (direct to end clients or within one or two layers), transparent disclosure of margins, careful sharing of project details, and a policy of never sharing your skill sheet without permission.
DeFactory upholds "direct to end clients, shallow supply chain, and transparency" as its three guiding principles, and as policy, always conducts an interview before introducing projects and carefully shares all information it can disclose, such as rate ranges, project content, and team composition. Since side work involves limited working hours, the quality of project information directly determines success or failure.
Side-work-specialized services like Shumatsu Worker have the strength of being designed with people who have a main job in mind. Conditions such as 10 hours per week or more, fully remote, and no specified time of day match the side work needs of company employees.
On the other hand, there are cases where it is dangerous to rely solely on a "10 hours per week OK" label. Even if not explicitly stated as a condition, weekday daytime meeting obligations, demands for instant chat responses, or on-call incident handling may be discovered later. A project's flexibility cannot be judged from surface-level conditions alone. Verifying the actual operational situation during an interview is key to determining whether a project is compatible with side work.
Crowdsourcing tends to involve price competition, so rates are often low. However, it is also an effective entry point for landing your first project, building a small track record, and getting used to client work. In the sense of "taking the first step from nothing," it has its uses.
However, it is not a place to stay for long. If you want to improve income efficiency and market value, keep in mind moving to higher-quality project distribution once you have accumulated a certain level of experience.
How you find side work depends on which phase you are currently in.
For beginners, it is realistic to start by building an initial track record through crowdsourcing or side work matching services. Mid-level engineers can move on to searching for projects of around two days per week through agents while verifying supply chain depth and transparency (since low-workload projects are a minority, this assumes searching through multiple agents). For those considering independence, it is important to get accustomed to direct-to-end-client and upstream projects from the side work stage. This is because the quality of projects you can take on through side work directly affects your rate level after going independent.
Most causes of failure in side work are not lack of skill but mistakes in project selection. Particularly important is the perspective of "workload design over working hours."
Labels like "2 days per week OK" or "10 hours per week OK" do not automatically mean a project is suitable for side work. What you really need to look at is how those hours are used.
How many weekday daytime meetings are there, how quickly are responses expected on Slack or Chatwork, does incident handling or on-call duty occur, is it an environment where tasks are easily interrupted in fragments, can work be managed on a weekly deliverable basis — confirming these during an interview is a prerequisite for continuing side work.
Even with a 10-hour-per-week allocation, a project with daily weekday daytime standing meetings will not work for a company employee. It is important to dig deeper into not just "total hours" but "how those hours are used."
Since side work has limited working hours, if time is consumed by requirements gathering, alignment, and absorbing specification changes, you lose the ability to do the actual work. Projects where the attitude is "let's just join and figure it out later," projects where it is unclear who the decision-maker is, projects where additional requests become the norm, and projects with vague completion criteria are a poor fit for side work.
The cause of burnout in side work is more often "disorganization on the client side" than technical difficulty. If you join a project with vague requirements, most of your limited working hours will be consumed by alignment efforts.
📌Pro Tip Side work's 10 hours disappear into "synchronization and coordination," not "work time" On projects with vague requirements and deep supply chains, 5 of your 10 weekly hours are stolen by "waiting for specification confirmations" and "pointless weekday daytime meetings." Only the remaining 5 hours are actually spent writing code and delivering value. The greatest benefit of choosing direct-to-end-client projects is not the higher rates but "eliminating wasted communication costs so you can focus on the technology."
The deeper the supply chain — first, second, third layers — the more problems cascade. Rates are cut each time an intermediary is added, information flow to the actual work site degrades, and it becomes unclear who the actual decision-maker is. Conditions also more easily shift between the interview and after joining.
While full-time work can absorb some inefficiency, for side work with only 10 hours per week, this kind of loss is fatal. DeFactory's principles of direct-to-end-client engagement, supply chains within one or two layers, and transparent disclosure of rates and margins exist precisely so that engineers are not burdened by losses caused by deep supply chains.
Summarizing everything so far, the definition of a side-work-friendly project comes into view. A project suitable for side work is not simply "a project with low workload," but "a project designed so that value can be delivered even in a short time."
Projects with clear task boundaries—such as improving existing features, developing specific APIs, supporting infrastructure design, code reviews, and PM assistance—are a good fit for side work. Let's review the differences between projects to avoid and good projects in the comparison table below.
| Item to check | Projects to avoid (multi-layer subcontracting) | Good projects to choose (direct with end client) |
|---|---|---|
| Clarity of requirements | "Just join us and figure it out as you go" | "We want to entrust you with the API design and implementation of this feature" |
| Communication | Regular meetings on weekday daytime, demands for instant replies | Primarily asynchronous chat + weekly alignment |
| Contract chain and margin | 3rd or 4th tier subcontracting (unclear who the decision-maker is, low rates) | Direct with end company (budget goes directly to you, fast decisions) |
| Actual workload | Officially 10 hours per week, but half disappears due to adjustments | 10 hours per week functions as almost entirely actual work time |
| Scope of responsibility | Additional requests and out-of-scope work become the norm | Scope is clearly documented, and changes are agreed upon each time |
Before taking the plunge into side work, there are a few minimum things you should confirm: company work rules, taxes, and workload planning. Engineers in particular face many issues that require extra caution compared to other professions.
While the Ministry of Health, Labour and Welfare's guidelines indicate a direction of accepting side jobs, what you must ultimately follow is your own company's work rules. First priority is checking your company's work rules regarding whether side work is allowed, whether notification is required, and the scope of non-compete restrictions.
Engineering is also a high-risk profession. Working in industries or on products similar to your main job may violate non-compete clauses, and engineers regularly handle confidential information such as source code, design documents, infrastructure configurations, and customer data. Avoid using your company-issued PC for side work, repurposing your main job's accounts or tools for side work, or bringing side-job data or credentials into your main job's environment. Physically and logically separating your development environments is the foundation for reducing the risk of information leaks.
When side income grows, tax issues are a common stumbling block. A frequent misunderstanding concerns the "200,000 yen rule": the threshold for requiring a final tax return is annual income of over 200,000 yen based on "income (revenue minus expenses)," not "revenue (gross income)."
Source: National Tax Agency "No. 1900: Salaried Workers Who Need to File a Final Tax Return"
Even if you have side income, if your income after deducting expenses such as transportation, equipment, and communication costs is 200,000 yen or less per year, you may not need to file a final income tax return. However, be aware that for resident tax, a separate report may be required regardless of income amount.
Once side income reaches a certain scale, you will also need to determine whether it is business income or miscellaneous income. It is recommended to understand the tax framework early on.
Many people make a simple calculation before starting side work: "I can spare 2 hours on weekdays plus 8-10 hours on weekends." In reality, however, busy periods at your main job, lack of sleep, family circumstances, and travel fatigue pile up, and things rarely go according to plan.
What matters is designing your workload around "margin in your life," not just "spare time." It is recommended to start with a lighter workload than you expect for the first few weeks. Increasing your workload later is not difficult, but if overwork affects your main job, the damage is irreversible.
A. First priority is checking your company's work rules regarding whether side work is allowed, notification requirements, and the scope of non-compete restrictions. When choosing an agent, check the shallowness of the contract chain (whether it is direct with the end client), margin transparency, and whether they have a policy of not sharing your skill sheet without permission. Rather than the number of available projects, prioritize the quality and transparency of project information.
A. The industry-wide average margin rate is said to be around 20-30%. Rather than judging solely on whether the margin rate is disclosed, the practical way to assess an agent is to check the final take-home amount, the ratio of direct end-client projects, and the number of contract layers. Even with a low margin rate, a deep contract chain means lower take-home pay, so it is important to look at the structure rather than just the rate.
A. The threshold for requiring a final tax return is annual income of over 200,000 yen based on "income (revenue minus expenses)," not "revenue (gross income)." Even if you have side income, if your income after deducting expenses is 200,000 yen or less per year, you may not need to file. However, since a separate report may be required for resident tax, it is recommended to sort this out early.
A. Side work is the safest way to test the waters before going independent. While keeping your main job's income, you can try on a small scale whether you can land projects, what you are asked in interviews, and whether you can handle contracts and invoicing, making it lower risk than suddenly quitting. However, since the quality of projects you can get through side work directly affects your rate level after going independent, choosing agents with shallow contract chains and high transparency from the side-work stage will also influence your career after independence.
【Related article】Freelance Engineer vs. Full-Time Employee: The Break-Even Point at 1.5x Salary and the Reality of "Returning to Employment"
📢 BizDev Tech Recommended Job Openings!
【Many cutting-edge projects where you can aim for top rates in PdM/PM and upstream processes!】
Tomita, our HR recruiting specialist, will propose undisclosed projects that maximize your market value.
>>
The side-work market is expanding both institutionally and in practice, and starting side work has become a realistic option for salaried engineers.
However, what determines success is not the services you register with or calculations of available hours, but the quality of the projects: the shallowness of the contract chain, the clarity of requirements, and the maturity of the client. Since side work has limited hours, losses from opaque projects or deep contract chains hit you directly. How many of your 10 weekly hours can actually be spent on real work is determined by how you choose your projects.
Side work is not just pocket money; it also serves as a way to visualize your market value, prepare for independence, and trial higher-rate areas. Engaging with projects with shallow contract chains and high transparency from the side-work stage will influence your subsequent career.
DeFactory, which operates BizDev Tech, offers a platform for freelancers specializing in direct end-client transactions and high-payout projects. If you are doing side work and looking for projects with shallow contract chains and transparent agents, start by checking your own market value. From side work to independence, we welcome engineers, PMs, and tech leads.
▶︎ First, check rate benchmarks → DeFactory Rate Diagnosis
▶︎ Looking for side projects with shallow contract chains? → Free Consultation / Agent Registration