Three frames, one rehearsal, and a colleague to help run the whiteboard: a Forward Deployed Engineer can map out the client's process and agree on priorities in 90 minutes.
Key Takeaways
- Miro has built-in workshop facilitation tools: Timer, Voting, Private Mode, frame hide/show, and Bring Everyone to Me.
- The work happens in two steps: first map the process with story mapping, then set priorities with voting and a 2x2 matrix.
- Rehearse in advance, assign a second person to operate the whiteboard, and write the questions on the board so latecomers can catch up.
Every requirements-gathering meeting hits a moment of silence. Five people from the client show up, each describes the process differently, and the final call usually goes to whoever holds the highest title. A carefully built Miro board avoids this: everyone writes, everyone votes, and everyone watches the same timer.
Forward Deployed Engineers (FDEs) run into this in their first week on-site with a client. You need to figure out two things: what the client's current process looks like, and what they most want to solve first. Email back-and-forth can take weeks; a well-structured workshop settles both in one session.
Can Miro handle the workshop?
Miro launched in 2011 under the name RealtimeBoard. Co-founder and CEO Andrey Khusid built it so his design agency could share ideas with remote clients. That's close to the situation FDEs face today.
Miro's facilitation guide lists several built-in tools: Timer, Bring Everyone to Me (which pulls everyone's screen to where you are on the board), and frame hide/show (which keeps part of the board hidden until it's needed).
Miro recommends using the Timer to cap each activity's duration and remembering to schedule breaks. The timer is visible to everyone, so everyone knows how many minutes remain.
The two most critical features for agreeing on priorities are Voting and Private Mode. According to Miro, Voting lets everyone express opinions simultaneously instead of waiting to raise hands in turn. Private Mode is recommended for sensitive or evaluative activities, because when input is anonymous, people offer more diverse views.
Example: 90 minutes with an invoice-processing team
Suppose you're deploying an agent that reads invoices for a distribution company's finance department. You build three frames the day before.
Frame 1 uses the User Story Mapping template, based on the method Jeff Patton popularized in 2005. Patton defines a story map as a way of telling the story of an entire product or feature.
Here, the "story" is the journey of an invoice: from arriving in the inbox to payment approval. In a timed 25 minutes, everyone places sticky notes under each step, noting where manual handling or waiting happens frequently.
Writing down pain points is an evaluative activity, so Private Mode should be on. Input is anonymous, so even with the department head in the room, employees will still write "matching against purchase orders one by one takes an entire afternoon."
Frame 2 is hidden with the hide/show feature until Frame 1 is done. You group the sticky notes—say, into 12 pain points—then start Voting. The 2021 Voting update lets the facilitator choose which objects on the board can be voted on, and results appear seconds after voting ends.
You select only those 12 pain-point sticky notes, so no one accidentally votes for titles or arrows. Everyone votes simultaneously, so no one waits to see which item the boss picks.
Frame 3 is the 2x2 Prio Matrix template. The horizontal axis is importance; the vertical axis is difficulty. The bottom-right quadrant holds high-impact, low-effort items.
The template guides the team to discuss and place items along the horizontal axis first, then the vertical. You put only the top five or so vote-getters into the matrix. The difficulty axis is where you, as the engineer, have the most authority.
Both sides leave seeing the same picture: the current process, the voted pain points, and one or two items in the bottom-right quadrant to tackle in the first iteration.
Whether the meeting goes smoothly depends on the day before
The example above works because everything was prepared in advance. The day before the meeting, complete five tasks in order.
First, build all three frames and hide frames 2 and 3 with hide/show, so the client doesn't see the next step before finishing the previous one. Second, write each activity's question in large text at the top of its frame. The UK-based dxw team found that writing questions on the board helps latecomers catch up.
Third, plan the agenda with the Timer: 25 minutes for process mapping, one segment for voting, one for the matrix, with a break in the middle as Miro recommends.
Fourth, designate a second person to operate the board. dxw found that remote workshops run more smoothly when someone is dedicated to responding quickly in Miro; they also found the Timer extremely useful.
Finally, rehearse. Miro recommends running through the entire workshop, especially with a co-facilitator. Practicing 20 minutes with a colleague is enough to surface the small mistakes that would cost you credibility in front of the client.
Common mistakes and how to avoid them
Most mistakes in Miro workshops stem not from the software itself but from how it's used. The table below summarizes the most common ones.
| Mistake | Consequence | How to avoid it |
|---|---|---|
| Treating voting as the decision | The top-voted item involves a system you don't yet have access to | Always run voting results through the 2x2 matrix again |
| All objects on the board are votable | Votes land on titles and arrows, muddying the results | When enabling Voting, select only the pain-point sticky notes |
| Open input while the boss is present | Employees won't write down real pain points | Turn on Private Mode when collecting pain points and evaluations |
| Voting session designed too long | Exceeds the limits of a single Voting session | Check the limits of the version you're using |
| Skipping the rehearsal | Forgot to grant edit access, or accidentally revealed a hidden frame | Run a 20-minute practice with your co-facilitator |
The first mistake deserves the most attention. Miro describes Voting as a way to help facilitators quickly and easily gauge team sentiment. Sentiment isn't feasibility, so the matrix step must never be skipped.
As for limits, in the 2021 version, each person gets a maximum of 99 votes, and each voting session lasts at most 99 minutes. These numbers may have changed, so verify again before designing longer activities.
What to learn first?
Start with the Timer and Bring Everyone to Me—these two tools set the pace of the entire meeting. Next, learn how to select objects for Voting, then move on to story mapping. The hardest skill isn't in the software at all: designing a focused enough question for each frame.
From a career perspective, if an FDE job posting you're targeting mentions requirements gathering or direct client engagement, workshops like this are worth putting on your resume. Don't just write "proficient in Miro."
Document the workshop's outcomes: how many pain points were collected, which one was chosen first, and which deployment it ultimately led to. A screenshot of the board with client information removed is powerful evidence in interviews.
Clients won't remember which template you used. They'll remember that, for the first time, everyone agreed on what to do first.
Was this article helpful?
Thanks for your feedback!
9 sources
- About Miro | Miro
- Facilitating Workshops with Miro | Miro
- Meeting Facilitation Best Practices | Miro · 2026-05-01
- Easily involve teams in decision-making with our improved Voting · 2021-10-14
- 2x2 Prio Matrix Template | Miro
- User Story Map Templates & Examples | Miro
- How Scrum Masters use Miro for user story mapping · 2018-01-10
- YOW Talk: User Story Mapping · 2014-12-08
- Improving remote workshops (dxw) · 2019-10-15